Xi'an UHP Dry AC and DC Casing Industrialization Project

Project Name: Xi'an UHP Dry AC/DC Casing Industrialization Project in Qindu District, Xianyang, Shaanxi Province (Updated) (2011-2012, 0.5 billion)
Progress Stage: Design Area: Shaanxi Construction Period: December 2011-December 2012 Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities. (for reference only)
Project Description:
The project is located at the Xidian Industrial Base in Qindu District, Xianyang, Shaanxi. The project is a comprehensive development with a total construction area of ​​approximately 30,000 square meters, including a six-storey office building, factory building and workshop. The total investment of the project is 50 million yuan.

Construction Unit: Xi'an Xideng High-Pressure Casing Co., Ltd. Postal address: No. 009, East Section of Xianyang Road, Xianyang Postcode: 712044
Contact: Zhang Suiping Electric

Related news: Tower crane Infrastructure information

Titanium Wire Electric Lock

Titanium wire lock has the following characteristics:
1. Low power consumption, low voltage, battery-powered.
2. Utilize the principle of energized and thermally contracted muscle titanium wire to achieve the traction of the shackle, overcome the shortcomings of easy heating and burnout of the electromagnet, and stable performance.

3. Adopt a special lock hook design, which can accept high-intensity vibration and overcome the problem that the lock is easy to fall off.

Titanium Wire Electric LockTitanium Wire Electric Lock

Titanium Wire Electric Lock,Titanium Wire Electronic Control Lock,Titanium Wire Stretch Electronic Lock,Mini Titanium Wire Electric Lock

Dongguan Kaisijin Intelligent Technology Co., Ltd , https://www.dgsmartlockoems.com