Stainless Steel/Alloy Steel Investment Casting Machinery Parts with ISO9001

Model NO.: CS1806
Surface Roughness: Ra3.2
Machining Tolerance: +/-0.01mm
Standard: AISI ASME BS ANSI JIS GB ASTM DIN
Certification: ISO 9001:2000, ISO 9001:2008
Function: Control Fuel Gas
Surface Finishing: Mirror Polishing/Stain Polishing/Chrome Plated
Craft: Investment Casting/Lost Wax Casting
Package: Poly Bag+CTN+Wooden Pallet
Trademark: CS
Transport Package: Ctns/Pallet
Specification: 2g-70kg
Origin: Linyi
HS Code: 73219000
Product Introduction.

 
casting technology investment casting/silic sol investment casting/lost wax casting
casting material carbon steel, stainless steel, alloy steel and etc
material standard AISI JIS GB DIN EN ASME
casting parts range automobile parts, machinery parts, marine hardware parts, door lock parts, pump valve and pipe fittings parts, bathroom hardware, kitchen hardware and so on
casting weight 2g-70kg
surface finishing sand blasting, stain polishing, mirror polishing, chrome plated, painted or as customer's request
machining milling, drilling, grinding, CNC machining
delivery time 15days for making molds and samples confirming, then 25-30days for trial order



Products Showing


Stainless Steel/Alloy Steel Investment Casting Machinery Parts with ISO9001



Production Process


Stainless Steel/Alloy Steel Investment Casting Machinery Parts with ISO9001


Our Workshop



Stainless Steel/Alloy Steel Investment Casting Machinery Parts with ISO9001




Our Testing Euipments


Stainless Steel/Alloy Steel Investment Casting Machinery Parts with ISO9001



FAQ

1. How many days it will take to develop one new item?
It will take about 20days to make molds and make samples for your checking.

2. What is your common delivery time for a bulk production?
Commonly 20-30days after prepayment paid

3. If we do not have related drawings, could you make drawing for us?
Yes, we can. Only you offer us detail information about your samples, our engineer can make correct drawings for you. 

4. What is common payment terms?

TT full payment for molds, then samples confirmed. The 30% TT prepayment should be arranged, then balance against BL copy.


 

HMC Machines

Hmc Machine,Horizontal Machining Center,Horizontal Machining Centre,Horizontal Machining Centers

Dongguan Liyang Intelligent Technology Co., Ltd , https://www.leyocncmachine.com