Grade 8 Carbon Steel Hexagon Head Thick Hex Nut

  • Model NO.: DY2032-3
  • Type: Hexagon Head
  • Head Style: Hexagonal
  • Grade: 8.8
  • Transport Package: Palletized Cartons
  • Origin: China
  • Material: High Strength Steel
  • Connection: Common Bolt
  • Standard: DIN, ANSI, GB, JIS, BSW
  • Trademark: DY
  • Specification: 28cm*25.5cm*17.5cm
  • HS Code: 7318160000
Description:
Black High Strength Steel Hexagon Head Thick Hex Nut


Dimension:
We make all standard sizes and non-standard sizes.

Sample Fee:
Samples of <10 pcs will be free,you need to pay for the shipping fee.

Sample Time:
For standard fasteners,the sample time will be about 2~3 days;
For non-standard fasteners,the sample time will be about 5~7 days.


Lead Time:
For standard fasteners,the lead time will be about 7~10 days;
For non-standard fasteners,the lead time will be about 10~15 days.


Item Details:
Grade 8 Carbon Steel Hexagon Head Thick Hex Nut
Grade 8 Carbon Steel Hexagon Head Thick Hex Nut
Grade 8 Carbon Steel Hexagon Head Thick Hex Nut






 

Closed Cooling Tower

Why say closed cooling tower is energy saving and environmental protection equipment, more and more users are using this kind of equipment to replace the original equipment (open tower), we can through data analysis and comparison, the two energy data accounting can be obvious. Energy consumption is basically two major aspects, one is water, the other is electricity. Both are energy costs that no cooling tower can escape, unless you leave the equipment on.

First of all, look at the consumption of water. Water is generally consumed in two aspects. One is the flying overflow after spraying, and the other is the evaporation consumption of water.

Let's look at the open cooling tower, the spray water of the tower is basically between two and three percent of the overflow rate, if we according to the daily operation of 10 hours, excluding holidays, 280 days of operation. According to the actual open cooling tower flow of 6000 cubic meters per hour to calculate. 6000*2%*10*280= 336,000 tons of water, and the same closed cooling tower, its spray flying overflow is very small, because after all, the spray work is carried out in the tower, almost can be controlled in a few thousandths, we calculate according to 5 thousandths, the same is 10 hours of work, 280 days a year operation, To achieve the same cooling amplitude is basically 4,500 tons per hour of closed cooling tower is enough, then the calculation results: 4,500 *0.5%*10*280= 63,000 tons, it is not difficult to see, because of the different design structure caused by the waste of spraying water resources, more than 200,000 tons of terror. The bigger the pool of the open tower, the more wasted water, because the evaporation area increases, and the closed cooling tower has no pool, so the consumption here is zero. Judging from the price of a ton of water, just such a equipment, a year to solve the capital of hundreds of thousands of enterprises.

Let's look at the comparison of electric energy, electric energy is not different, because they are all through the same power equipment to operate the equipment, the power of the two is similar, the running time is the same, basically the energy consumption is about the same.

To sum up, for the closed cooling tower energy saving accounting can be strong to open the tower out, and, today are advocating energy conservation and environmental protection, this is the general trend, so the closed cooling tower is more and more favored by the majority of users.

Closed Cooling Tower,Closed Circuit Cross Flow,Closed Loop Cooling Tower,Closed Circuit Cooler

Wuxi Ark Fluid Science Technology Co., Ltd. , https://www.arkfluid.com